By continuing use this site, you agree to the Terms & Conditions and our use of cookies.
  • New
    Mainboard for AMS 2 Pro [DLB022]
    Mainboard for AMS 2 Pro [DLB022]
    Mainboard for AMS 2 Pro [DLB022]

    Mainboard for AMS 2 Pro [DLB022]

    Review (0)
    $120.43
    Tax included
    Last items in stock

    Auckland Local Stock
    Authorized NZ Distributor – Marvle3D

    *Bambu Lab Part- Mainboard for AMS 2 Pro
    -Core control board for all AMS 2 Pro functions
    -Connects sensors motors and system modules
    -Includes BT2 five screws for easy installation
    -Ensures stable communication and reliability
    -Official replacement for optimal performance

    Compatible With: Bambu Lab AMS 2 Pro

    Why Marvle3D?
    Marvle3D—New Zealand’s expert since 2016, offering friendly support, in-store demos, and one of the country’s largest ranges.

    Quantity :
    Hurry Up Only 3 Items left items
    Write your review
    EU3234363840424446USXX5XSSMLXLXXLXXLArm Length6161,56262,56363,56464,5Bust Circumference8084889296101106111Waist Girth6165697377828792Hip Circumference87919599103108113118
    • Security policySecurity policy(edit with the Customer Reassurance module)
    • Delivery policyDelivery policy(edit with the Customer Reassurance module)
    • Return policyReturn policy(edit with the Customer Reassurance module)

    Step 1: Remove the PTFE Tube from the Back of the AMS
    Press the PTFE tube release button on the rear of the AMS to unlock the fitting, then pull the PTFE tube out to detach it.


    Step 2: Remove the PTFE Tube Release Button
    Pinch the clip on the inside of the lower cover to pop the PTFE tube release button open, then pull it out from the back of the AMS while holding the PTFE tube to prevent the spring from ejecting.


    Step 3: Remove the AMS Main Frame Assembly
    Remove the driven support sleeves from the two middle slots to reveal the screw holes, carefully keeping track of the end bearings, then remove screws A securing the main frame; lift the front first to create clearance and stand the frame vertically without pressing the vent electronics, unplug the signal and power cables from the power board, and lift the entire main frame assembly out.

    Step 4: Disconnect All Mainboard Cables
    Unplug all 18 cables from their connectors on the mainboard, marking each cable or taking a reference photo to ensure correct reconnection during reassembly.


    Step 5: Remove the Mainboard
    Remove the two screws securing the AMS mainboard, then lift it from the bottom while squeezing the leftmost clip outward to release all six clips and detach the mainboard.

    Bambu Lab
    DLB022
    3 Items

    Specific References

    No customer reviews for the moment.

    Write your review
    Mainboard for AMS 2 Pro [DLB022]

    You might also like

    Mainboard for AMS 2 Pro [DLB022]

    Mainboard for AMS 2 Pro [DLB022]

    $120.43
    Tax included